期刊文献+

水砂—胶结充填隔离矿柱稳定性及宽度研究

Study on Stability and Width of Isolated Pillar Between Water Sand Backfill and Cemented Backfill
下载PDF
导出
摘要 某嗣后充填矿山前期水砂充填泌水效果不佳,充填体富水,随着水砂充填区域增大,开采过程中顶板及上盘稳定性变差,为改善开采安全状态,改用胶结充填,水砂充填区与胶结充填区之间的隔离矿柱是保证未来采矿安全的关键。构建了侧壁承压倾斜矿柱理论分析模型,并采用FLAC3D数值模拟软件对10~15 m宽度水砂—胶结充填隔离矿柱和不同水砂充填体静水压力梯度进行了研究。研究表明:①开采扰动会使隔离矿柱内形成应力集中,且未凝固的水砂充填体会进一步增加矿柱内最大主应力;②矿柱内部应力重分布及水砂充填体水平压力使得矿柱水平变形增加,逐步产生破坏形成塑性区,10~13 m的隔离矿柱不足以保障充填体含水工况下的采场稳定性;③考虑到爆破扰动的影响,在现有富水充填情况下,建议隔离矿柱宽度为15 m;④隔离矿柱宽度15 m时,随着静水压力梯度增加,矿柱内部最大主应力和水平变形会有所增长,但塑性区未发生明显增加,15 m宽的隔离矿柱可以保障后续开采安全。 The water sand filling method was used in the early stage of a subsequent filling mine,and the water secretion effect of the filling body was poor,and the filling body was rich in water.With the increase of water-sand filling area,the stabil-ity of roof and hanging wall of the stope becomes worse.In order to improve the mining safety,the mining enterprise adopt the cemented filling method.Therefore,it is urgent to set isolated pillar between water sand filling body and cemented filling body to ensure the safety of subsequent mining activities.In this study,the theoretical analysis model of side wall pressure inclined pillar is constructed,and the hydrostatic pressure gradient of 10~15 m width water sand-cemented filling isolated pillar and dif-ferent water sand filling bodies is studied by FLAC3D numerical simulation software.The study results show that:①Mining dis-turbance will cause stress concentration in the isolated pillar,and the non-solidified water sand filling body will further increase the maximum principal stress in the pillar.②The redistribution of the stress of the pillar and the horizontal pressure of the wa-ter sand filling body increases the horizontal displacement of the pillar,and gradually produce damage and form a plastic zone.The 10~13 m isolated pillar is not enough to support the stability of the stope under the water bearing condition of the filling body.③Considering the influence of blasting disturbance,in the case of existing water rich backfill,the recommended isolated pillar width is 15 m.④When the width of isolated pillar is 15 m,with the increase of hydrostatic pressure gradient,the maxi-mum principal stress and displacement in the pillar increase slightly,and the plastic zone does not increase significantly,indi-cating that the 15 m isolated pillar can ensure the safety of the stope in the mining process.
作者 王作鹏 金爱兵 孙文斌 庞如顺 陈帅军 WANG Zuopeng;JIN Aibing;SUN Wenbin;PANG Rushun;CHEN Shuaijun(Shandong Dongping Hongda Mining Co.,Ltd.,Tai′an 271000,China;School of Civil and Resource Engineering,University of Science and Technology Beijing,Beijing 100083,China)
出处 《金属矿山》 CAS 北大核心 2024年第3期19-28,共10页 Metal Mine
基金 国家自然科学基金项目(编号:52174106)。
关键词 水砂充填 胶结充填 隔离矿柱 FLAC^(3D) 静水压力梯度 water sand filling cemented filling isolated pillar FLAC3D hydrostatic pressure gradient
  • 相关文献

参考文献21

二级参考文献246

共引文献153

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部