小清河防洪综合治理胶东调水工程档案管理探讨

Discussion on File Management in Xiaoqing River Comprehensive Flood Control and Water Diversion to Jiaodong Project
下载PDF
导出
摘要 重大水利工程建设具有规模大、周期长、投资多的特点,整个建设过程中会产生大量的档案。工程档案作为记录工程项目施工、建设管理全过程的重要载体,其重要意义不言而喻。本文通过介绍小清河防洪综合治理胶东调水工程全周期档案管理的主要做法和作用发挥,为后续水利工程档案管理提供参考和借鉴。 The construction of major water resources projects has the characteristics of large scale,long cycle and huge investment,and a large number of files will be produced in the whole construction process.As an important carrier to record the whole process of construction execution and management,the significance of engineering files is self-evident.This paper introduces the main practice and function of the file management in Xiaoqing River comprehensive flood control and water diversion to Jiaodong project in the whole cycle,providing reference for the file management of subsequent water projects.
作者 杨波 常文娟 尹相美 YANG Bo;CHANG Wenjuan;YIN Xiangmei(Dongying Branch Center,Water Diversion Project Operation and Maintenance Center of Shandong Province,Guangrao,Shandong 257300,China)
出处 《山东水利》 2024年第3期56-58,共3页 Shandong Water Resources
关键词 小清河 防洪工程 胶东调水 档案管理 Xiaoqing River Flood control engineering The water diversion to Jiaodong project File management
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部