海上高墩移动模架现浇箱梁施工技术研究及应用

Research and Application of Cast-in-situ Box Girder Construction Technology of Offshore High Pier Mobile Mold Frame
下载PDF
导出
摘要 随着我国桥梁建设的不断发展,移动模架施工现浇梁工艺在桥梁建设中得到了广泛应用。由于海上复杂的水流、波浪和风力等环境因素,移动模架在海上桥梁建设施工中面临着独特的挑战。以龙门大桥建设为例,探讨了在海上复杂条件下移动模架拼装以及在不同工况下施工、曲线过孔、双幅交叉作业、自行倒退等一系列挑战,通过创新传统工艺,促进了海上高墩移动模架现浇箱梁施工的安全有序进行。 With the continuous domestic development of bridge construction,the cast-in-situ beam technology of mobile mold base construction has been broadly applied.Due to complex environmental factors such as currents,waves and ocean winds,mobile frame construction faces specific challenges in offshore bridge construction.Taking the construction of Longmen Bridge as a case study,this paper discussed a series of challenges such as mobile mold frame assembly under complex offshore conditions,construction under different working conditions,curved vias,double-width cross-working,and self-regression.Via innovative traditional technology,this study contributes to the safet and orderly construction of the cast-in-situ box girder of the mobile mold frame of the offshore high pier.
作者 朱俊颖 ZHU Junying(Guangxi Road and Bridge Engineering Group Co.,Ltd.,Nanning 530004,China)
出处 《上海建材》 2024年第2期49-51,共3页 Shanghai Building Materials
关键词 复杂条件 模架拼装 不同工况 曲线过孔 交叉作业 自行倒退 complex condition mold frame assembly different working condition curved vias cross operation selfregression
  • 相关文献

参考文献4

二级参考文献42

共引文献30

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部