期刊文献+

基于电网项目物资全过程协同的物资供应服务模式研究

Research on the Material Supply Service Model Based on the Whole Process Collaboration of Power Grid Project Materials
下载PDF
导出
摘要 电网建设项目物资供应是保障电网建设进度和质量的重要环节。通过对传统电网建设项目物资供应模式分析,发现存在管理失衡、协同不足、流程不规范和监管不力等问题,导致项目物资供应与工程建设管理脱节,供应链协同效率低下。本文探索研究全流程协同的物资供应服务模式,为规范和改进电网项目物资供应管理提供有益借鉴。 The supply of materials for power grid construction projects is an important link in ensuring the progress and quality of power grid construction.By analyzing the material supply mode of traditional power grid construction projects,discovering issues such as management imbalance,insufficient collaboration,non-standard processes,and inadequate supervision,causing a disconnect between project material supply and engineering construction management,low efficiency of supply chain collaboration.This article explores the material supply service model of full process collaboration,provide useful reference for standardizing and improving the material supply management of power grid projects.
作者 石卓义 麻宇升 周磊 雷浩 Shi Zhuoyi;Ma Yusheng;Zhou Lei;Lei Hao(Southern Power Grid Supply Chain Yunnan Co.,Ltd.,Kunming,Yunnan 650051,China)
出处 《云南电力技术》 2024年第2期17-20,共4页 Yunnan Electric Power
关键词 电网建设物资 物资供应协同 供应专项服务 物资供应保障 Power grid construction materials Collaborative supply of materials Provide specialized services Material supply guarantee
  • 相关文献

参考文献9

二级参考文献47

共引文献26

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部