隧道下穿既有地铁车站影响研究与车站预留下穿条件分析

Research on the impact of tunnel undercrossing existing metro stations and analysis of station reserved underpass conditions
下载PDF
导出
摘要 随着轨道交通建设的发展,已建地铁车站对规划线路区间隧道下穿的预留有多种形式。文章结合成都不同的车站预留下穿条件和下穿方式进行研究与探讨,对直径8.3m盾构隧道下穿既有运营车站的监测值进行归纳总结,对车站预留下穿条件进行分析,并提出合理化建议,为后续隧道下穿既有运营车站的安全控制及车站预留规划隧道下穿条件提供参考。 With the development of rail transit construction,there are various forms of reservation for tunnel underpass in planned line sections at existing metro stations.This article studies and explores the reserved underpass conditions and underpass methods for different stations in Chengdu.Summarize the monitoring values of the 8.3m diameter shield tunnel passing through existing metro stations.Analyze the reserved underpass conditions at the station and propose reasonable suggestions.Provide reference for the safety control of tunnel underpass through existing operating stations and the reserved planning of tunnel underpass conditions for stations in the future.
作者 张庆 ZHANG Qing(China Railway Eryuan Engineering Group Co.,Ltd.,Chengdu 610031,China)
出处 《中国高新科技》 2024年第5期130-132,共3页
关键词 隧道工程 下穿地铁车站 车站预留隧道下穿条件 车站内力重分布 既有线沉降 tunnel engineering underpass metro stations reserved tunnel underpass conditions at stations redistribution of station internal forces settlement of existing lines
  • 相关文献

参考文献5

二级参考文献54

共引文献52

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部