摘要
基于北京地铁施工隧道暗挖施工穿越既有城市人行天桥的实际施工过程,地下水控制、地质改良加固、开挖参数及工筹优化、环境动态监测、桥梁分区顶升等一整套施工方法及保证措施有效解决了我国超大型城市核心区内上下台阶法及双侧壁导坑工法正线隧道垂直下穿主桥,以及多层小洞径横通道近距离侧穿天桥梯道的难题,可为类似工程提供借鉴。
Based on the actual construction process of underground tunneling through existing urban pedestrian bridges in Beijing subway,this paper adopted a set of construction methods and guarantee measures such as groundwater control,geological improvement and reinforcement,excavation parameters and construction optimization,environmental dynamic monitoring,and bridge area jacking.It solves the problems of vertical down bridge and short side pass of flyover stairway in multi-storey small hole diameter cross passage in the core area of super large cities in China.
作者
李延涛
翟洪超
许童童
卢园园
LI Yan-tao;ZHAI Hong-chao;XU Tong-tong;LU Yuan-yuan(BCEG Civil Engineering Co.,Ltd.,100015,Beijing,China;Beijing Construction Engineering Group Co.,Ltd.,100055,Beijing,China)
出处
《建筑技术》
2024年第8期933-936,共4页
Architecture Technology
关键词
人行天桥
暗挖隧道
同步顶升
pedestrian bridge
subsurface tunnel
synchronous jacking