摘要 北京东部某在建大型交通枢纽工程主体结构与钢结构施工基本完成,建成后可实现高铁、公交、出租车、网约车、地铁的换乘功能,枢纽工程施工较晚,开始建设时北侧与西侧已建成城市道路,东侧邻近已建成高铁站房,南侧为地铁在建工程,施工红线内93.4%的占地面积为明挖基坑,加之基坑中枢纽与地铁工程同步施工,施工难度极大、工期极其紧张,地铁车站同期同一基坑中施工,这对基坑开挖阶段的各项施工标准提出了全新的要求。主要介绍了多级基坑施工阶段一系列施工现场的主要技术要求及注意事项。 The construction of the main structure and steel structure of a large-scale transportation hub under construction in the east of Beijing city has been basically completed,at the beginning of construction,the urban road has been built on the north side and the west side,the high-speed railway station building has been built on the east side,and the subway station is on the south side,in addition,the central hub of the foundation pit and the subway project are under construction at the same time,the construction site is small,the project is large,the construction is very difficult,and the construction period is extremely tight,so the subway station is under construction at the same time in the same foundation pit,this paper mainly described the main technical requirements and matters needing attention of a series of construction sites in the construction stage of multi-stage foundation pit.
作者 王林 魏曦瑶 白磊 张志强 张智 WANG Lin;WEI Xi-yao;BAI Lei;ZHANG Zhi-qiang;ZHANG Zhi(BCEG Civil Engineering Co.,Ltd.,100015,Beijing,China)
出处 《建筑技术》 2024年第8期959-961,共3页 Architecture Technology
关键词 大型交通枢纽 地铁车站 同时施工 基坑开挖 基坑支护 large-scale transportation hub subway station simultaneous construction foundation pit excavation foundation pit support
  • 相关文献

参考文献4

二级参考文献13

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部