水电安装工程中造价超预算的原因及对策

Reasons and Countermeasures for Cost Over-Budget in Hydropower Installation Projects
下载PDF
导出
摘要 随着经济的发展,水电工程建设规模也在不断扩大,同时,由于施工难度大、投资高以及技术要求高等特点使得造价超预算问题日益突出。本文首先分析引起造价超额主要影响因素并总结出其产生的根本性结论和建议;其次从技术层面出发对引发施工过程中因人为操作失误、材料质量不合格等方面进行探讨与研究,提出合理有效措施以减少因疏忽而导致工程预算出现不必要损失,提高经济效益。 With the development of economy,the construction scale of hydropower projects is also expanding,and at the same time,the problem of cost over-budget becomes increasingly prominent due to the characteristics of difficult construction,high investment and high technical requirements.This paper firstly analyzes the main influencing factors of cost overrun and summarizes the fundamental conclusions and suggestions;then discusses and studies the human operation errors and unqualified material quality in the construction process from the technical level,and proposes reasonable and effective measures to reduce the unnecessary loss of project budget due to negligence and improve economic benefits.
作者 张清 Zhang Qing(Haiyi Hengan Project Management Co.,Ltd.,Jinan 250000,Shandong Province,China)
出处 《建筑与装饰》 2024年第9期88-90,共3页 Construction & Decoration
关键词 水电安装 造价超预算 原因对策 hydropower installation cost over-budget cause countermeasures
  • 相关文献

参考文献2

二级参考文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部