机场跑道区清淤回填砂振冲密实施工技术探究

Exploration of Vibro-Compaction Technology of Dredged Backfill Sand in Airport Runway Area
下载PDF
导出
摘要 本文依托深圳三跑扩建工程对于机场跑道区清淤回填砂振冲密实的施工技术开展应用研究分析。振冲施工前应对回填砂料进行抽检,根据颗粒级配进行可振冲性分析,确定砂料采用振冲密实法加固的“适宜数”,并选取适宜的振冲方案。采用多种手段确定振冲施工的间距和深度,并据此展开振冲施工典型试验研究。研究表明:回填地基采用无填料振冲可以取得较好密实效果,施工过程中宜控制间距,确定振冲间距时可考虑双点或多点共振叠加效应影响;对于孔隙水为海水的回填砂层,振冲施工结束后期,其强度增长具有时间效应。 Based on Shenzhen Third-Runway expansion project,the vibro-compaction technology of dredged backfill sand in airport runway area was researched and analyzed from the aspect of application.The backfill sand should be randomly inspected before vibroflotation,so a feasibility analysis was carried out according to sand particle gradation,which led to the suitable number of the sand material to be reinforced by using vibro-compaction method.In addition,an appropriate vibroflotation plan was selected,various means were used to determine the vibroflotation spacing and depth,and a typical experimental study could be conducted accordingly.The research shows that non-filler vibroflotation can achieve a better compaction effect subject to the spacing being controlled well.Double or multi-point resonance superposition effect can be considered while determining the spacing.As for the backfill sand layer with pore seawater,its strength growth is of time effect at the end of vibroflotation construction.
作者 刘红明 李耀华 王争光 敖祖瑞 许伟健 Liu Hongming;Li Yaohua;Wang Zhengguang;Ao Zurui;Xu Weijian(CCCC South China Communications Construction Co.,Ltd.,Guangzhou Guangdong 510320,China;CCCC Guangzhou Water Transportation Engineering Design&Research Institute Co.,Ltd.,Guangzhou Guangdong 510221,China)
出处 《港口航道与近海工程》 2024年第2期127-132,共6页 Port,Waterway and Offshore Engineering
关键词 机场跑道区 回填砂 振冲密实 施工技术 airport runway area backfill sand vibro-compaction construction technology
  • 相关文献

参考文献5

二级参考文献2

共引文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部