摘要
土方工程量统计是工程项目中的重要工作,关系到项目实施的各个环节。Civil3D软件依据调蓄水池原始地形创建原始地形曲面,结合调蓄水池的设计参数,对“体积面板”模块中三角网体积曲面计算原理进行二次开发,调用软件的API函数可实现快速统计调蓄水池土石方工程量,相较于传统统计土石方工程量的方法,该方法计算精度高、运算时间短、实时性高,大大提高了设计人员的工作效率,为调蓄水池的工程设计提供新的设计思路。
Earthwork volume statistics is an important work in engineering projects,which is related to all aspects of project implementation.The Civil3D creates the original topographic surface based on the water diversion reservoir original topographic surface,and combined with the design parameters,aims at the secondary development of the triangulation volume surface calculation principle in the“volume panel”module of the Civil3D software.The Civil3D API function of the software is invoked to realize the rapid statistics of the earthwork volume of the reservoir,and the method is compared with the traditional method.The results show the calculation accuracy is higher,the operation time is short,the real-time is high,and the work efficiency of the designer is improved,and it provides new design ideas for the engineering design of water diversion reservoir.
作者
张嘉明
张琳
陈万宝
马天皓
Zhang Jiaming;Zhang Lin;Chen Wanbao;Ma Tianhao(Gansu Water Resources and Hydropower Design Institute Survey,Design and Research Institute Co.,Ltd Lanzhou 733000,China)
出处
《吉林水利》
2024年第5期30-33,共4页
Jilin Water Resources
基金
2023年度甘肃省水利厅科研项目(项目编号23GSLK059)。