摘要
垃圾焚烧发电设备的安装是城市垃圾发电厂建设的重中之重,介绍了垃圾焚烧发电设备安装的主要技术,并结合以往经验,在部分工艺环节中采取了创优措施,各项措施改进后发电厂一切环节运行正常,可为其他工程提供借鉴。
The installation of waste incineration power generation equipment is the top priority in the construction of urban garbage power plants.This paper introduces the main technology of waste incineration power generation equipment installation,and combines the past experience,takes measures of excellence in some process links.After the improvement of various measures,all links of the power plant operate normally,which can provide reference for other projects.
作者
李少环
LI Shao-huan(China Railway 18th Bureau Group Southern Engineering Co.,Ltd.,Guangzhou 511400,China)
出处
《机械工程与自动化》
2024年第3期187-189,共3页
Mechanical Engineering & Automation
关键词
生活垃圾
焚烧发电
设备安装
创优措施
household waste
incineration power generation
equipment installation
measures of excellence