期刊文献+

辽宁省水电开发现状及其发展潜能分析

Analysis of the Current Situation and Development Potential of Hydroelectric Development in Liaoning Province
下载PDF
导出
摘要 随着疫后经济恢复与发展,2021年辽宁省发生了较严重的电力短缺现象。基于辽宁省水电发展现状和水能资源开发利用程度的系统分析,指出了当前水电发展面临的问题与建设机遇、有利和不利条件;以辽宁省多年水电发展相关规划成果为基础,分析了辽宁省未来可建设的常规水电站和抽水蓄能电站规划情况;通过利用上下游水库建设抽水蓄能电站具体案例分析,提出了辽宁省开发水电的保障措施建议,为辽宁省新时期水电建设提供参考。 With the post epidemic economic recovery and development,Liaoning Province experienced a severe electricity shortage in 2021.This article is based on a systematic analysis of the current situation of hydropower development and the degree of hydropower resource development and utilization in Liaoning Province,pointing out the problems,construction opportunities,advantages,and disadvantages faced by current hydropower development;Based on the relevant planning achievements of hydropower development in Liaoning Province for many years,this paper analyzes the planning situation of conventional hydropower stations and pumped storage power stations that can be constructed in the future in Liaoning Province;By analyzing specific cases of using upstream and downstream reservoirs to construct pumped storage power stations,suggestions for ensuring the development of hydropower in Liaoning Province are proposed,providing reference for the hydropower construction in Liaoning Province in the new era.
作者 刘玉龙 LIU Yu-long(Liaoning Provincial Water Resources Affairs Service Center,Shenyang 110003,Liaoning Province,China)
出处 《中国农村水利水电》 北大核心 2024年第5期237-242,共6页 China Rural Water and Hydropower
关键词 水电开发 发展规划 系统分析 hydropower development development planning system analysis
  • 相关文献

参考文献8

二级参考文献26

共引文献82

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部