摘要
由于结构的差异,相比于地上式污水处理厂,地下式污水处理厂施工过程中面临的风险更加复杂。为了应对地下式污水处理厂施工过程中的风险,文章以W市地下式污水处理厂项目为例,首先通过文献研究筛选出影响地下式污水处理厂施工安全的风险因素,然后利用ISM模型分析各风险因素间的相互影响关系,文章得出研究结果可为地下式污水处理厂施工安全风险管理提供科学依据。
Due to the differences in structure,compared to above-ground wastewater treatment plants,underground wastewater treatment plants face more complex risks during construction.In order to address the risks in the construction process of underground wastewater treatment plants,the article takes the underground wastewater treatment plant project in City W as an example.It first selects risk factors affecting the construction safety of underground wastewater treatment plants through literature research,then analyzes the interrelationships between various risk factors using the Interpretive Structural Modeling(ISM)Method.The article concludes that the research results can provide a scientific basis for the management of construction safety risks in underground wastewater treatment plants.
作者
王迪
WANG Di(Shenzhen Gushu Water Purification Co.,Ltd.,Shenzhen 518000,China)
出处
《价值工程》
2024年第14期27-30,共4页
Value Engineering
关键词
解释结构模型(ISM)
地下式污水处理厂
施工安全
风险因素
interpretive structural modeling method(ISM)
underground wastewater treatment plant
construction safety
risk factors