摘要
工业透平驱动汽轮机空负荷试车系统改建完成后,经过各设备调试、系统独立调试、系统联合调试等工作,验证系统设计、安装质量及性能。文章介绍各系统调试方案及系统调试过程。
lndustrial driven steam turbine no load testing system need equipment independent debugging and system independent debugging and system joint debugging after reeonstruclion.The purpose of debugging is testing the result of system design and construction.In the article debugging scheme and processing are presented.
作者
魏应强
赵诗均
姚润贤
吴波
王淑婧
WEI Yingqiang;ZHA Shijun;YAO Runxian;WU Bo;WANG Shujing(Dongfang Turbine Co.,Ltd.,Deyang Sichuan,618000)
出处
《东方汽轮机》
2024年第1期67-70,74,共5页
Dongfang Turbine
关键词
驱动汽轮机
试车系统
独立调试
联合调试
driven steam turbine
test system
independent debugging
system joint debugging