期刊文献+

施工现场精细化管理对项目成本与工期的影响

Influence of Fine Management of Construction Site on Project Cost and Time Limit
下载PDF
导出
摘要 为探讨施工现场精细化管理对项目成本与工期的影响,采用问卷调查和SPSS 27.0软件进行数据分析。结果显示,施工现场精细化管理的各维度尤其是计划与调度、质量管理和安全管理与项目成本及工期的控制存在显著的正相关性,说明通过优化计划与调度、提升质量管理标准、加强安全管理措施可有效减少项目成本并缩短工期。 In order to explore the impact of fine management on project cost and schedule,the study conducts data analysis with questionnaire survey and SPSS 27.0 software.The results show that there is significant positive correlation between the various dimensions of fine management of construction site,especially the planning and scheduling,quality management and safety management,and the control of project cost and construction period,indicating that optimizing planning and scheduling,improving quality management standards,and strengthening safety management measures can effectively reduce project cost and shorten the construction period.
作者 龙新 Long Xin(CCCC SHEC Construction Engineering Company Limited,Wuhan 430014,China)
出处 《黑龙江科学》 2024年第10期156-158,共3页 Heilongjiang Science
关键词 可靠性分析 描述性统计 相关性分析 精细化管理 Reliability analysis Descriptive statistics Correlation analysis Fine management
  • 相关文献

参考文献4

二级参考文献13

共引文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部