水电工程石方洞挖单价调整方法分析

Analysis of the Method for Adjusting the Unit Price of Excavation of Stone Tunnels in Hydropower Engineering
下载PDF
导出
摘要 水电工程受勘察设计深度不足、地质构造复杂、合同文件不严谨等影响,合同实施阶段往往会出现较多变更索赔。从工程事件及合同管理的实际出发,在注重实用性、可操作性和知识体系完备性的前提下,针对同一事件引起的索赔提出不同的处理方式,以期达到为水电工程合同管理同行提供参考的目的。 Hydroelectric engineering is often affected by the insufficient depth in survey and design,complex geological structures,and imprecise contract documents.During the implementation stage of the contract,there are often many changes and claims.Starting from the actual situation of engineering events and contract management,while emphasizing practicality,operability,and completeness of knowledge system,different handling methods are proposed for claims caused by the same event,in order to provide reference for peers in hydropower engineering contract management.
作者 何思聪 何若冰 符世梁 石彪 HE Sicong;HE Ruobing;FU Shiliang;SHI Biao(Huaneng Lancang River Hydropower Inc.,Kunming 650000,China)
出处 《云南水力发电》 2024年第S01期118-121,共4页 Yunnan Water Power
关键词 水电工程 索赔 石方洞挖 单价调整 hydroelectric engineering claim excavation of stone tunnel unit price adjustment
  • 相关文献

参考文献6

二级参考文献5

共引文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部