水电工程因物价波动引起的价格调整方法

Methods for Price Adjustment in Hydropower Projects Caused by Price Fluctuations
下载PDF
导出
摘要 由于水电工程的专业特点,因物价波动引起的价格调整不可避免。价格调整是工程项目合同造价管理的重要内容,也是合同履行过程中合同双方关注的焦点之一,如果因为合同约定的价格调整方法不适用或约定的条件不充分时,容易引起争议,进而影响合同的顺利履行。根据相关行业的政策规范及在工程实践过程中的不断总结,水电工程因物价波动引起的价格调整的方法基本采用价格指数法,此种方法有其独特的优势,使用较普遍,且在实践中的不断运用过程中,价格指数法又可细分为单因子价格指数法和分类综合指数法,而两种方法的使用情况、计算方式及结果均有较大区别。根据两种方法的区别和联系及具体工程项目的特点,界定两种方法选择的范围及在此基础上如何进行创新性应用。 Due to the professional characteristics of hydropower engineering,price adjustments caused by price fluctuations are inevitable.Price adjustment is an important part of cost management in engineering project contracts,and it is also one of the focuses of attention for both parties in the contract performance process.If the price adjustment method stipulated in the contract is not applicable or the agreed conditions are insufficient,it is easy to cause disputes,which will affect the smooth performance of the contract.According to the policy norms of relevant industries and continuous summarization in engineering practice,the price adjustment method for hydropower projects caused by price fluctuations is basically the price index method.This method has its unique advantages and is widely used.In the continuous application process in practice,the price index method can be further divided into single factor price index method and classification comprehensive index method,and the usage,calculation methods,and results of the two methods are significantly different.Based on the differences and connections between the two methods,as well as the characteristics of specific engineering projects,define the scope of selection for the two methods and how to apply them innovatively on this basis.
作者 梁洪浩 危才计 LIANG Honghao;WEI Caiji(Southwest University of Science and Technology,Mianyang 621000,China;China Zhongnan Water Conservancy&Hydropower Engineering Consulting Co.,Ltd.,Changsha 410000,China;POWERCHINA SINOHYDRO ENGINEERING BUREAU 14 CO.,LTD.,Kunming 650041,China)
出处 《云南水力发电》 2024年第S01期136-139,共4页 Yunnan Water Power
关键词 水电工程 物价波动 价格调整 方法 hydropower engineering price fluctuation price adjustment method
  • 相关文献

参考文献7

二级参考文献15

  • 1刘玉杰,何伯森.国际工程承包的调价工作[J].国际经济合作,2005(11):55-56. 被引量:10
  • 2邬晓光.FIDIC条款中合同价格调整方法及其应用[J].东北公路,1996,19(4):54-56. 被引量:2
  • 3鲁布革工程管理局.鲁布革水电站建设项目管理的实践[J].水力发电,1994,(8).
  • 4鲁布革工程管理局.世界银行·项目采购补充指南[S].,1984(11)..
  • 5陈开朗.我们是怎样处理合同价格低于实际成本的[J].水电建设管理通讯,(11).
  • 6鲁布革工程管理局.鲁布革水电站·基本建设竣工统计报告[R].,1994..
  • 7二滩水电工程公司.二滩水电站·地下厂房工程标·第87次进度款支付签证[R].,1999年5月17日.P1.
  • 8鲁克瀛.加拿大安大略电力公司水电工程造价管理考察简介[J].水电建设管理通讯,(35).
  • 9水利部 国家电力公司 国家工商行政管理局.价格调整.水利水电工程施工合同和招标文件示范文本[S].,2000..
  • 10.水利水电工程造价价差调整办法[R].能源水规(1989)第1151号附件三[R].,..