为有效解决水库坝基渗漏失稳问题,以某水库大坝为例,在明确其坝基存在渗漏失稳问题的基础上,通过多方案比选确定混凝土防渗墙防渗加固方案,提出混凝土防渗墙各项重要参数,据此对混凝土防渗墙的施工工艺流程和方法进行深入分析,使混凝土防渗墙在水库坝基防渗加固中的应用达到理想成效。
In order to effectively solve the problem of seepage instability in the dam foundation of a reservoir,taking a certain reservoir dam as an example,based on clarifying the problem of seepage instability in its dam foundation,a concrete anti-seepage wall reinforcement plan is determined through multiple scheme comparisons.Then,important parameters of the concrete anti-seepage wall are proposed,andfinally,the construction process and methods of the concrete anti-seepage wall are analyzed in depth,in order to provide reference for relevant personnel and achieve ideal results in the application of the concrete anti-seepage wall in the anti-seepage reinforcement of the reservoir dam foundation.
作者
张建忠
Zhang Jianzhong(People’s Government of Bincheng District Yangliuxue Town,Binzhou,Shandong 256655)
出处
《现代工程科技》
2024年第10期113-116,共4页
Modern Engineering Technology
关键词
水库坝基
坝基渗漏
坝基防渗加固
混凝土防渗墙
reservoir dam foundation
dam foundation leakage
dam foundation anti-seepage reinforcement
concrete anti-seepage wall