摘要
实心方墩是桥梁中常见的一种墩身形式,对于山区桥梁而言,通常采用较高的墩身设计,由此增加了施工难度,提高了技术要求。通过介绍高桥墩实心方墩主要的施工步骤及注意事项,从外观控制和质量控制两个方面阐述了高桥墩实心方墩墩身的施工质量控制技术,最终保证实心方墩能够满足相关技术规范要求。
Solid square pier is a common form of pier in Bridges.For Bridges in mountainous areas,high pier design is usually adopted,which improves the construction difficulty and technical requirements.This paper introduces the main construction steps and precautions of solid square pier of high bridge pier,expounds the construction quality control technology of solid square pier of high bridge pier from two aspects of appearance control and quality control,and finally ensures that solid square pier can meet the relevant technical specifications.
出处
《建筑技术开发》
2024年第6期113-115,共3页
Building Technology Development
关键词
高桥墩
混凝土
实心方墩
high pier
concrete
solid square pier