期刊文献+

强透水性砂层地连墙施工关键技术探讨 被引量:1

Discussion on Key Technologies Applied in Construction of Concrete Diaphragm Wall Based on Highly Permeable Sand Layer
下载PDF
导出
摘要 文章通过对地连墙成槽中泥浆配比、导墙高度、槽壁稳定性等关键因素进行了经典的土力学理论计算和数值模拟及实践验证。对地连墙成槽开挖控制的关键点进行了总结。基于临江强透水性砂层的悬挂式帷幕超深地下连续墙施工项目,通过上述研究给出了强透水性砂层地下连续墙成槽施工防止坍塌的措施。针对强透水砂层地连墙槽段开挖的控制要点很好的缩减了工期;使用超深地下连续墙的空间桁架支撑实施方法进行地连墙钢筋笼的焊接和吊装,有效的提高施工效率并节省了大量人力物力;通过研究新型地连墙接头止水构件,在施工进程中有效杜绝了地连墙接缝渗水的隐患。 Soil mechanics-based theoretical calculation,numerical simulation,and engineering practice are combined to determine key factors such as slurry ratio,the height of guide wall and the stability of trench wall in the formation of concrete diaphragm wall,complete with the key points related to the trenching control of concrete diaphragm wall.By analyzing the construction of ultra-deep concrete diaphragm of a suspended curtain based on a highly permeable sand layer near river,some countermeasures to the collapse occurred during the construction are proposed.The trenching control points help shorten the construction period.The spatial truss support for ultra-deep concrete diaphragm wall applies to the welding and hoisting of steel cages,which improves the construction efficiency,lowers costs and man-hours.The study on new type of waterstop components for the joints of concrete diaphragm wall will avoid water seepage of the joints during the construction.
作者 韩俊国 张立军 王雷 李胜林 贾涛 胡小波 Han Junguo;Zhang Lijun;Wang Lei;Li Shenglin;Jia Tao;Hu Xiaobo(The Third Engineering Company Limited of CCCC Third Harbor Engineering Co.,Ltd.,Nanjing Jiangsu 210011,China;CCCC Shanghai Harbor Engineering Design&Research Institute Co.,Ltd.,Shanghai 200235,China)
出处 《港口航道与近海工程》 2024年第3期108-115,共8页 Port,Waterway and Offshore Engineering
关键词 槽壁稳定性 地下连续墙 强透水性砂层 泥浆护壁 钢筋笼 stability of trench wall concrete diaphragm wall highly permeable sand layer slurry protection wallrebar cage
  • 相关文献

参考文献8

二级参考文献47

共引文献106

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部