摘要
G244线庆阳过境段公路工程火巷沟特大桥16号主墩桩基工程的墩位出露地层为第四系风积黄土夹古土壤,下伏白垩系泥岩,桩身上部黄土地质中粉质黏土层极易塌孔,加之下部泥岩层抗压强度大,具有桩基数量多、桩长深、孔径大、地质复杂,成孔难度大、施工工期紧等难点。文章根据技术分析,选用了徐工XR580HD、XR400E旋挖钻机进行成孔,取得了良好效果。在此基础上,总结了前述不利条件下的大直径超长桩基主要施工技术,旨在为今后黄土地区超长桩基底部泥岩层旋挖成孔施工提供参考。
The exposed stratum of No.16 main pier pile foundation project of Huoxianggou Bridge in Qingyang transit section of G244 line is Quaternary aeolian loess with ancient soil,underlying Cretaceous mudstone.The silty clay layer in the loess geology of the upper part of the pile body is easy to collapse.In addition,the compressive strength of the lower mudstone layer is large,which has many dificulties such as large number of pile foundations,deep pile length,large pore size,complex geology,difficult hole forming and tight construction period.According to the technical analysis,Xugong XR580 HD and XR400 E rotary drilling rigs were selected for hole forming,and good results were achieved.On this basis,the main construction technologies of large-diameter super-long pile foundation under the above adverse conditions are summarized,aiming to provide reference for the rotary drilling hole construction of the mudstone layer at the bottom of super-long pile foundation in loess area in the future.
作者
宁俊峰
NING Junfeng(China Railway 17th Bureau Group Material Co.,Ltd.,Taiyuan 030000,Shanxi,China)
出处
《工程技术研究》
2024年第7期95-97,共3页
Engineering and Technological Research
关键词
旋挖钻机
硬质泥岩
超长桩基
白垩系泥岩
旋挖成孔
复合钻头
接力套打
rotary drilling rig
hard mudstone
super-long pile foundation
cretaceous mudstone
rotary drilling into holes
composite drill bit
relay sleeve play