超大基坑及底板分块施工部署及专项技术

Construction Arrangement and Special Technology of Super-Large Foundation Pit and Floor
下载PDF
导出
摘要 在超大基坑施工中,围护结构变形往往会同时受到基坑分区和施工顺序的影响,因而在各类基坑工程应用中,基坑分区和分隔墙位置的设计应避免由于超大基坑土体应力场变化造成围护结构变形过量甚至损害的情况。通过合理设置分隔型基坑群和土方开挖顺序,能够有效优化分隔区段内支护结构,显著减少围护结构和周边环境变形,形成更稳定的基坑开挖和底板施工环境。 In the construction of super-large foundation pit,the deformation of retaining structure is often affected by foundation pit zoning and construction sequence at the same time,so in the application of all kinds of foundation pit engineering,the design of foundation pit zoning and partition wall location should avoid excessive deformation or even damage caused by the change of soil stress field of super-large foundation pit.Through the reasonable setting of separated foundation pit group and earthwork excavation sequence,the supporting structure in the separated section can be effectively optimized,the deformation of retaining structure and surrounding environment can be significantly reduced,and a more stable foundation pit excavation and floor construction environment can be formed.
作者 邱迪 黄泽志 顾大为 QIU Di;HUANG Zezhi;GU Dawei(Shanghai Construction No.5(Group)Co.,Ltd.,Shanghai 200333,China)
出处 《工程质量》 2024年第S01期166-170,共5页 Construction Quality
基金 上海市2020年度“科技创新行动计划”社会发展科技攻关项目--临港冰雪之星智能化建造技术工程示范(20dz1202006)。
关键词 深大基坑 分隔型基坑群 土方开挖 底板施工 deep and large foundation pit separated foundation pit group earthwork excavation floor construction
  • 相关文献

参考文献6

二级参考文献31

共引文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部