摘要
某工程污水处理采用一体化污水处理设备,在工艺的末端设置清水池。由于工程条件的不同,在处理水质的要求、进出水量的控制、水池液位的设置要求也有所不同。论文通过对工程各项条件的分析对比,提出合理的清水池液位控制方案、绿化回用供排水方案。
An integrated sewage treatment equipment is used for sewage treatment of a project,and a clean water tank is set at the end of the process.Due to different engineering conditions,the requirements for water quality treatment,control of water inflow and outflow,and setting of pool level are also different.Based on the analysis and comparison of various conditions of the project,this paper puts forward a reasonable level control scheme of the cleanwater tank,a greening and reusewater supply and drainage scheme.
作者
渐明柱
JIAN Ming-zhu(China Railway Liuyuan Group Co.Ltd.,Tianjin 300308,China)
出处
《工程建设与设计》
2024年第9期138-140,共3页
Construction & Design for Engineering
关键词
污水处理
清水池
液位控制
绿化回用
sewage treatment
cleanwater reservoir
liquid level control
green recycl