隧道超欠挖控制技术探究——以钻爆法为例

Research on Control Technology of Tunnel Over-Excavation and Under-Excavation——Taking Drilling and Blasting Method as an Example
下载PDF
导出
摘要 针对隧道施工中超欠挖现象频发的问题,以钻爆法为例,结合实际工程经验,在保证隧道施工效率的同时,提出了多种超欠挖控制技术。研究结果表明,在钻爆法超挖控制技术中,结合了4种优化策略的方法实现了超挖量的显著降低。相较于其他单独的方法,该方法使得超挖量最小化至3.22 cm。同时还发现融合3种优化策略的技术使得欠挖量缩小至1.38 cm,为隧道施工的质量和安全性保障提供了可靠的技术支持。 In view of the frequent phenomenon of over-excavation and under-excavation in tunnel construction,taking drilling and blasting method as an example,combined with practical engineering experience,while ensuring the efficiency of tunnel construction,various control technologies of over-excavation and under-excavation are put forward.The research results show that in the over-excavation control technology with drilling and blasting method,four optimization strategies are combined to realize the significant reduction of over-excavation.Compared with other separate methods,this method minimizes the over-excavation to 3.22cm.At the same time,it is also found that the technology combining three optimization strategies can reduce the amount of under-excavation to 1.38cm,which provides reliable technical support for the quality and safety guarantee of tunnel construction.
作者 丁守运 DING Shou-yun(Qingdao West Coast New Area Transport Bureau,Qingdao 266400,China)
出处 《工程建设与设计》 2024年第8期166-168,共3页 Construction & Design for Engineering
关键词 隧道 超欠挖 控制技术 钻爆法 Jtunnel over-excavation and under-excavation control technology drilling and blasting method
  • 相关文献

参考文献3

二级参考文献28

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部