期刊文献+

跨区域大型水库管理范围划定工作实践与思考——以官厅水库为例

Practice and reflection on defining the management scope of large cross regional reservoirs:Taking Guanting Reservoir as aanexample
原文传递
导出
摘要 根据官厅水库的实际情况,结合其历史发展,总结该项目中遇到的问题及对相应对策进行整理分析,提出针对性的建议,为更多的大型跨界水库的勘界定桩工作提供新思路。通过多角度、多维度分析本次勘界定桩工作存在的问题与原因,得出“广泛搜集资料,明确历史沿革;寻找分析多条历史管理范围线的演变,划定新管理范围线;加强两地协同沟通,解决争议问题”等切实可行工作方法,在提高工作效率的同时,保证了勘界定桩工作的科学性和先进性。 Based on the actual situation of Guanting Reservoir and its historical development,this paper summarizes the problems and corresponding strategies encountered in the project,analyzes them,and pro-poses targeted countermeasures and suggestions,providing new ideas for the boundary and pile positioning work of more large-scale cross-border reservoirs.Through multi angle and multi-dimensional analysis of the problems and causes of this boundary survey and pile fixing work,practical and feasible work methods such as"extensive collection of data,clear historical evolution;seeking and analyzing the evolution of multiple historical management lines,delimiting new management lines;strengthening coordination and communica-tion between the two places,and resolving disputes"are obtained,which not only improves the work efficien-cy,but also ensures the scientificity and progressiveness of the boundary survey and pile fixing work.
作者 蒋宇航 陈月平 吴彦颖 韩旭 王春蕾 刘斌 袁万里 JIANG Yuhang;CHEN Yueping;WU Yanying;HAN Xu;WANG Chunei;LIU Bin;YUAN Wanli(Beijing Municipal Administration Division of Guanting Reservior,Zhangjiakou 075441,China;Zhongshui North Survey,Design and Research Co.,Ltd.,Tianjin 300000,China)
出处 《北京水务》 2024年第S01期50-55,共6页 Beijing Water
关键词 勘界定桩 水库管理范围 解决争议 delineation and piling reservoir management scope dispute resolution
  • 相关文献

参考文献10

二级参考文献19

共引文献42

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部