摘要
针对寿光弥河洪水灾害问题,文章通过对弥河防洪治理工程(寿光段)提升新增工程中铝合金装配式防洪墙的结构设计、工艺流程、工作原理的分析和对其50年一遇防洪标准的相关理论计算分析,说明装配式防洪墙的使用效果及其应用前景。
Aiming at the problem of flood disaster of Mi River in Shouguang,this paper analyzes the structural design,process flow and working principle of the fabricated aluminum alloy flood control wall in the new project of Mi River flood control and improvement project(Shouguang Section),and the relevant theoretical calculation and analysis of once-in-50-year flood control standard.Furthermore,it explains the utilization effect and application prospect of the fabricated flood control wall.
作者
张丽华
周金橙
杜梦飞
ZHANG Lihua;ZHOU Jincheng;DU Mengfei(Linyi Shuizong Construction Group Co.,LTD.,Linyi,Shandong 276000,China)
出处
《山东水利》
2024年第4期51-53,共3页
Shandong Water Resources
关键词
弥河
装配式防洪墙
防洪减灾
Mi River
Fabricated flood wall
Flood control and mitigation