高压及超高压XLPE电缆附件施工时电缆绝缘处理工艺

Cable Insulation Treatment Process in Construction of High-Voltage and Ultra-High-Voltage XLPE Cable Accessories
下载PDF
导出
摘要 在XLPE电缆附件安装施工过程中,需将电缆接头与其他附件进行连接,在现场施工时,经常出现电缆绝缘处理不到位的情况,导致电缆接头与其他附件无法良好连接,影响电缆使用寿命。因此,在现场施工前对电缆绝缘进行处理十分必要。本文主要对高压及超高压XLPE电缆附件施工时电缆绝缘处理工艺进行分析。通过对高压及超高压XLPE电缆附件施工中电缆绝缘处理工艺的分析,总结现场施工经验,可为现场施工提供一定的参考。 In the process of installation and construction of XLPE cable accessories,the cable joint needs to be connected with other accessories.During the on-site construction,the cable insulation treatment is often not in place,resulting in poor connection between cable joint and other accessories,and affecting the service life of the cable.Therefore,it is necessary to perform cable insulation treatment before on-site construction.This paper mainly analyzes the cable insulation treatment process during the construction of high-voltage and ultra-high-voltage XLPE cable accessories.Through the analysis of the cable insulation treatment process in the construction of high-voltage and ultra-high-voltage XLPE cable accessories,the on-site construction experience is summarized,which can provide a certain reference for on-site construction.
作者 杨勇诚 杨凡 Yang Yong-cheng;Yang Fan(State Grid Shanghai Municipal Electric Power Company Cable Branch,Shanghai 200072,China)
出处 《科学与信息化》 2024年第11期134-136,共3页 Technology and Information
关键词 高压及超高压XLPE电缆 附件施工 电缆绝缘 处理工艺 high-voltage and ultra-high-voltage XLPE cable accessories construction cable insulation treatment process
  • 相关文献

参考文献3

二级参考文献8

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部