沿海围垦区钻孔灌注桩施工出现的问题及防治措施

Problems and Prevention Measures in the Construction of Bored Piles in Coastal Reclamation Areas
下载PDF
导出
摘要 围垦吹填工程常常涉及厚度不均、低承载力的高压缩性海积淤泥和淤泥质粉质黏土,这些条件给超长钻孔灌注桩的施工、成桩质量和单桩承载力带来了挑战。本文通过具体案例分析,研究了沿海围垦区钻孔灌注桩施工过程中所遇问题,并在此基础上提出了针对性的防治措施。这些建议旨在为业界同仁提供有益的参考和借鉴。 Reclamation and reclamation projects often involve highly compressible marine sediments and silty clay with uneven thickness and low bearing capacity,which pose challenges to the construction,pile quality,and single pile bearing capacity of ultra long bored piles.This article studies the problems encountered during the construction of bored piles in coastal reclamation areas through specific case studies,and proposes targeted prevention and control measures based on this.These suggestions aim to provide useful reference and inspiration for colleagues in the industry.
作者 曹超 Cao Chao(Project Management Department of China Railway Construction Port and Navigation Bureau Group Co.,Ltd.Liuheng Bridge Phase II Project,Zhoushan,China)
出处 《科学技术创新》 2024年第13期177-180,共4页 Scientific and Technological Innovation
关键词 沿海围垦区域 桩基施工特点 措施 coastal reclamation areas construction characteristics of pile foundation measure
  • 相关文献

二级参考文献2

共引文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部