钢箱梁顶推施工过程导梁的计算分析与监测

Calculation Analysis and Monitoring of Guide Beams during Steel Box Girder Jacking Construction Process
下载PDF
导出
摘要 钢箱梁顶推施工是桥梁建设中常见的施工方法。通过对钢箱梁顶推施工全过程进行计算,分析钢导梁在整个施工过程中的应力及位移变化,通过实际监测结果与理论计算分析值进行对比,结合应力自动化监测结果,实时了解结构的受力状态,为顶推施工提供技术支持。 Steel box girder jacking construction is a common construction method in bridge construction.By calculating the entire process of steel box girder jacking construction,analyzing the stress and displacement changes of the steel guide beam during the entire construction process,comparing the actual monitoring results with the theoretical calculation analysis values,and combining with the stress automation monitoring results,the stress state of the structure can be understood in real time,providing technical support for top pushing construction.
作者 李勇 LI Yong(Hunan Lianzhi Technology Co.,Ltd.,Changsha 410000,China)
出处 《价值工程》 2024年第17期138-140,共3页 Value Engineering
关键词 钢箱梁 钢导梁 顶推施工 施工监测 steel box girder steel guide beam top pushing construction construction monitoring
  • 相关文献

参考文献2

二级参考文献3

共引文献31

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部