摘要 对湘钢2号高炉炉身上部结瘤的原因及处理进行了阐述。2号高炉从炉墙轻微结厚,逐步发展成为较为严重的结瘤,瘤体厚度达800mm以上,分析结瘤的原因,主要是块矿入炉粉末多及烧结矿质量劣化,炉内碱金属循环富集现象严重,炉身中上部冷却强度过大。根据2号高炉自身实际状况,采用物理击打法消除结瘤,实现了炉况的快速恢复,生产指标明显改善。这次结瘤处理过程教训深刻,认为高炉操作炉型的维护应以预防为主,无论是结厚还是结瘤,预防是关键,处理要及早,不能犹豫不决。 The causes and control of scaffolding in the upper part of Xiangtan Steel No.2 BF stack are introduced.The initial slight wall accretion occurred in the furnace gradually develops to scaffolding,and the thickness of scaffolding part exceeds 800 mm.The main reasons of the scaffolding fall on high content of powdered ore in lump ore charged to the furnace,deterioration of the sinter quality,serious recycling and enrichment of basic metal in the furnace,and over-cooling in the middle and upper part of the stack.Considering the actual conditions of the furnace,the scaffolding is removed through physical hitting,which makes furnace condition recovered quickly,and the production indicators improved significantly.The scaffolding treatment process is quite difficult,thus it is believed that the key point to remain good BF operating profile is to prevent wall accretion and scaffolding,and both the wall accretion and scaffolding,if occur,shall be removed in time.
作者 章鹏程 罗大军 王经鑫 ZHANG Pengcheng;LUO Dajun;WANG Jingxin(Ironmaking Plant,Xiangtan Iron and Steel Group Co.,Ltd.,Xiangtan 411100,Hunan,China)
出处 《炼铁》 CAS 北大核心 2024年第2期31-34,39,共5页 Ironmaking
关键词 高炉 炉身 操作炉型 结厚 结瘤 冷却强度 blast furnace stack furnace operating profile wall accretion scaffolding cooling intensity
  • 相关文献

参考文献8

二级参考文献23

  • 1朱清天,程树森.高炉块状带煤气流分布的数值模拟[C].杭州:全国炼铁生产技术会议暨炼铁年会文集,2006:495-496.
  • 2张寿荣,于仲洁.高炉失常与事故处理[M].北京:冶金工业出版社,2012:125-153.
  • 3王筱留.钢铁冶金学(炼铁部分)[M].北京:冶金工业出版社,2013.
  • 4胡小云,万淑霞,余亮风,等.南钢4号高炉炸瘤实践[C].中国金属学会.2007年中小高炉炼铁学术年会论文集,2007.256-259.
  • 5Bi X G, Fu S M, Cheng X, et al. Influences of Scaffold and Coal Injection on Gas and Liquid Flow Distributions in Blast Furnace: Experimental Study [J]. Ironmaking Steelmaking, 2000, 27(6): 432-436.
  • 6Bi X G, Qiu J, Wang W, et al. Influences of Scaffold and Coal Injection on Gas and Liquid Flow Distributions in Blast Furnace: Mathematical Model [J]. Ironmaking Steelmaking, 2001, 28(1): 27-32.
  • 7Ichida M, Nishihara K, Tamura K, et al. Influence of Inner Wall Profile on Descending and Melting Behavior of Burden in BlastFurnace [J]. ISIJ Int., 1991, 31(5): 515-523.
  • 8Umekage T, Yuu S, Kadowaki M. Numerical Simulation of Blast Furnace Raceway Depth and Height, and Effect of Wall Cohesive Matter on Gas and Coke Particle Flows [J]. ISIJ Int., 2005, 45(10): 1416-1425.
  • 9Umekage T, Kadowaki M, Yuu S. Numerical Simulation of Effect of Tuyere Angle and Wall Scaffolding on Unsteady Gas and Particle Flows Including Raceway in Blast Furnace [J]. ISIJ Int., 2007, 47(5): 659-668.
  • 10Qing G L,/Via L, Zhang X S, et al. Numerical Investigation of Gas Flow through Blast Furnace Shaft with Designed Layered Structure of Ore and Coke Burdens [J]. Ironmaking Seelmaking, 2010, 37(7): 546-552.

共引文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部