期刊文献+

大跨度中承式拱桥缆索吊装系统施工技术

Construction technology of cable hoisting system for long-span half-through arch bridge
下载PDF
导出
摘要 以巫山大宁河双线大桥为背景介绍了大跨度拱桥缆索吊装系统的施工技术,主要包括塔架拼装施工、塔架缆索体系施工、塔架缆风体系施工、锚固体系施工以及试吊方案,对于同类型项目具有参考意义。 Based on the Daning River double-line bridge in Wushan,this article introduces the construction technology of long-span half-through arch bridge cable lifting system,mainly including cable tower assembly construction,tower cable system construction,tower cable wind system construction,anchor system construction and test hoisting scheme,which can provide reference for similar projects.
作者 黄勃竣 袁胜彬 程果 李燕强 王雄 Huang Bojun;Yuan Shengbin;Cheng Guo;Li Yanqiang;Wang Xiong(Fifth Engineering Company of China Railway No.2 Engineering Group Co.,Ltd.,Chengdu Sichuan 610091,China;School of Civil Engineering,Southwest Jiaotong University,Chengdu Sichuan 610031,China)
出处 《山西建筑》 2024年第13期170-173,共4页 Shanxi Architecture
基金 四川省科技厅科技创新研究团队项目(2021JTDTD0012) 中央高校基本科研业务费项目(2682022ZTPY019)。
关键词 缆索塔架 缆索吊装 施工技术 钢管混凝土拱桥 cable tower cable erection construction technology concrete-filled steel tube arch bridge
  • 相关文献

参考文献3

二级参考文献5

  • 1郑皆连 徐风云 唐柏石.广西邕宁邕江大桥千斤顶斜拉扣挂悬拼架设钢骨拱桁架施工仿真计算方法[A]..中国公路学会桥梁与结构工程学会1996年桥梁学术论文集[C].北京:人民交通出版社,1996.214-228.
  • 2Jorge Nocedal,Stephen Wright.Numerical Optimization[M].New York:Springer-Verlag Inc,1999.
  • 3Kasuga A,Arai H,Breen J E,et al.Optimum Cable-force Adjustments in Concrete Cable-stayed Bridges[J].Journal of Structural Engineering,1995,121(4):685-693.
  • 4Liu Chunlu,Hammad Amin,Itoh Yoshito.Multiobjective Optimization of Bridge Deck Rehabilitation Using a Genetic Algorithm[J].Microcomputers in Civil Engineering,1997,12(6):431-443.
  • 5周水兴,江礼忠,曾忠,周建庭.拱桥节段施工斜拉扣挂索力仿真计算研究[J].重庆交通学院学报,2000,19(3):8-12. 被引量:88

共引文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部