东曲煤矿长距离掘进巷道贯通测量技术

Break Through Survey Technology of Long-distance Driving Roadway in Dongqu Coal Mine
下载PDF
导出
摘要 东曲煤矿+860水平西翼轨道巷与羊圈港进风斜井在进行贯通测量时,采用了高质量测量仪器,制定了合理的测量方案,并进行了施工测量,使此次贯通顺利接合。导线连测后,在水平重要方向上的闭合差为±406 mm,在高程上的闭合差为±104 mm,贯通测量精度可满足巷道掘进及安全使用需求。 High quality measuring instruments were used,a reasonable survey scheme was made,and construction survey was carried out in break through survey to make a smooth connection between Dongqu Coal Mine+860 horizontal west wing track roadway and Yangjuangang inlet inclined shaft.After the conductor was connected,the closure difference in the horizontal important direction was±406 mm,and the closure difference in the elevation was±104 mm.The through survey accuracy can meet the needs of roadway excavation and safe use.
作者 赵辉 ZHAO Hui(Dongqu Coal Mine,Xishan Coal Electricity Co.,Ltd.,Gujiao 030200,Shanxi,China)
出处 《能源与节能》 2024年第6期161-163,共3页 Energy and Energy Conservation
关键词 长距离巷道 贯通测量 测量误差 long distance roadway break through survey survey error
  • 相关文献

参考文献7

二级参考文献40

共引文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部