田湾核电站生产计划项目运行风险分析研究

Operational Risk Analysis of Tian Wan Nuclear Power Station Production Planning Project
下载PDF
导出
摘要 通过对田湾核电站生产计划项目特点和运行风险进行分析,建立一套全面的风险管控框架,包括风险分级、风险缓解和监控等方面,并提出以工单为核心的“全过程”运行风险管控方法,将有助于提高核电厂生产计划项目运行风险管控的安全性和可靠性,降低潜在风险,促进核能的可持续发展。 By analyzing the characteristics and operational risks of Tian Wan nuclear power station production planning projects,a comprehensive risk control framework is established,including risk classification,risk mitigation and monitoring,and a"whole process"operational risk control method with work order as the core is proposed,which will help improve the safety and reliability of operational risk control of nuclear power plant production planning projects,reduce potential risks,and promote the sustainable development of nuclear energy.
作者 杜元 DU Yuan(Jiangsu Nuclear Power Corporation,Lianyungang 222000,China)
出处 《价值工程》 2024年第18期18-20,共3页 Value Engineering
关键词 核电站 生产计划项目 运行风险 分析 nuclear power station production planning project operational risk analysis
  • 相关文献

参考文献3

二级参考文献4

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部