摘要 某500kV变电站主变35kV侧发生一起电容器组串联电抗器短路故障,通过对事故现场检查,结合故障录波器记录,对本次事故发生的过程进行了分析并得出结论。针对本次故障暴露出的问题,从串联电抗器安装位置、在线监测等方面提出了事故防范措施,对于变电站电容器组安全运行具有一定参考价值。 A short circuit fault of the capacitor bank series reactor occurred on the 35 kV side of the 500 kV main transformer in a substation.Through the inspection of the accident site,and combining with the fault recorder record,the process of the accident was analyzed and the conclusion was drawn.In view of the problems exposed by this fault,the accident prevention measures are put forward from the series reactor installation position and online monitoring,which has certain reference value for the safe operation of the substation capacitor bank.
作者 王世涛 孙蒙蒙 杨箫箫 桂顺生 马鲁 WANG Shitao;SUN Mengmeng;YANG Xiaoxiao;GUI Shunsheng;MA Lu
出处 《电力系统装备》 2024年第4期77-79,共3页 Electric Power System Equipment
关键词 串联电抗器 故障分析 短路故障 series reactor fault analysis short-circuit fault
  • 相关文献

参考文献6

二级参考文献60

共引文献61

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部