摘要
随着我国城市化进程的加快,地铁作为一种高效、环保的公共交通方式,正逐渐成为解决城市交通拥堵问题的关键。然而,在地铁隧道施工过程中,盾构机穿越复杂地质条件成为一大技术难题。文章以某城市地铁盾构工程为背景,分析了复杂地质条件下盾构机施工所面临的问题,并探讨了相应的解决措施,以期为类似工程提供参考。
With the acceleration of urbanization in China,the subway,as an efficient and environmentally friendly public transportation method,is gradually becoming the key to solving urban traffic congestion problems.However,in the construction process of subway tunnels,the shield tunneling machine crossing complex geological conditions has become a major technical problem.This article takes a subway shield tunneling project in a certain city as the background,analyzes the problems faced by shield tunneling machine construction under complex geological conditions,and explores corresponding solutions,in order to provide reference for similar projects.
作者
周思贤
ZHOU Sixian(Bridge and Tunnel Engineering Co.,Ltd.of China Railway No.3 Engineering Group,Chengdu,Sichuan,610036,China)
出处
《智能城市应用》
2024年第7期60-62,共3页
Smart City Application
关键词
盾构机
复杂地质
施工技术
问题分析
解决措施
shield tunnels machine
complex geology
construction technology
problem analysis
solution measures