护盾式TBM抱盾现象的形成机制与预测

Formation Mechanism and Prediction of Shield Gripping in Shielded TBM
下载PDF
导出
摘要 主要针对护盾式TBM法施工隧洞掘进过程中发生的“洞抱盾”问题进行研究,分析了围岩变形等因素造成TBM抱盾的成生机制,提出了预测方法与风险评估思路,用于前期勘察设计阶段的TBM抱盾卡机预测和评价。 This paper mainly focuses on the problem of"shield gripping"that occurs during the tunnel excavation process using the shielded Tunnel Boring Machine(TBM).It analyzes the generation mechanism of shield gripping caused by factors such as rock deformation,and proposes a prediction method and risk assessment approach for shield gripping and jamming in the preliminary investigation and design stages.
作者 玉博 郑玮 刘进 YU Bo;ZHENG Wei;LIU Jin(China Water Resources Beifang Investigation,Design and Research Co.Ltd.,Tianjin,300222;Xinjiang Water Resources and Hydropower Survey,Design and Research Institute Co.Ltd.,Urumqi,830000;Xinjiang Water Conservancy Development Investment(Group)Co.Ltd.,Urumqi,830099)
出处 《水利水电工程设计》 2024年第2期23-27,共5页 Design of Water Resources & Hydroelectric Engineering
关键词 护盾式TBM 抱盾 围岩大变形 风险分析 shield-type TBM shield gripping large deformation of surrounding rock risk analysis
  • 相关文献

参考文献3

二级参考文献16

共引文献73

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部