摘要
生产建设项目水土保持后续设计深度不足,导致水土保持措施难以实施和水土保持设施验收困难,成为当前水土保持管理工作亟待解决的问题。本文探讨水土保持后续设计内容和相关技术要求,保障水土保持措施有效实施和竣工验收顺利开展,为进一步实现水土保持监督管理向“全严准”转变,促进社会经济和生态环境保护协同发展提供依据。
The insufficient depth of following design of soil and water conservation in production and construction projects leads to the difficulty of implementing soil and water conservation measures and accepting soil and water conservation facilities,which has become an urgent problem to be solved in current soil and water conservation management.Further standardization for the content of following design of soil and water conservation and related technical requirements,and the guidance for following design of soil and water conservation in production and construction projects are needed to ensure the effective implementation of soil and water conservation measures and the smooth acceptance of soil and water conservation facilities.Finally,the supervision and management for the following design of soil and water conservation can be transformed to be"comprehensive,strict and accurate",promoting the coordinated development of social economy and ecological environmental protection.
作者
詹晓群
ZHAN Xiaoqun(China Railway Water Conservancy&Hydropower Planning and Design Group,Nanchang Jiangxi,330029 China)
出处
《江西水利科技》
2024年第3期218-221,共4页
Jiangxi Hydraulic Science & Technology
关键词
水土流失
水土保持
后续设计
Soil erosion
Soil and water conservation
Following design