期刊文献+

大埋深综采工作面高水充填沿空留巷矿压显现规律研究

Study on ground pressure behaniour law of high water filling gob-side entry retaining technology in fully-mechanized mining face with large buried depth
下载PDF
导出
摘要 为揭示大埋深综采工作面高水充填沿空留巷矿压显现规律,以梧桐庄矿182605下工作面为工程背景,通过理论分析、方案设计和现场监测相结合的方法进行研究。根据现场巷道围岩变形量及速率变化规律分析可知,沿空留巷采用加强支护+超前切顶卸压+高水充填联合支护后,累计变形量和变形速率先缓慢增大再显著增大之后保持稳定,其中变形速率呈“几”型状。依据规律将沿空巷道的围岩变形划分成3个区域,分别是缓慢变形区、显著变形区和稳定变形区。工作面周期来压步距为35~40 m,对巷道围岩起到有效的控制作用。矿井现场试验表明,充填体完好,强度满足实际需求,巷道变化较小,达到预期目标。 In order to reveal the rock pressure behavior of high water filling along goaf retaining roadway in fully mechanized mining face with large burial depth,No.182605 lower working face of Wutongzhuang Mine was taken as the engineering background.theoretical analysis,scheme design and on-site monitoring were used to carry out research.According to the observation and analysis of the surrounding rock deformation and rate change law of the field roadway,it was known that the accumulative deformation and deformation rate increased slowly and then increased significantly,and then remained stable,after a set of technologies of“advance roof cutting.pressure relief and high water filling combined support”.The deformation rate was in the shape of Chinese word“几”.The surrounding rock deformation of the roadway was divided into three areas,namely the slow deformation area,the significant deformation area and the stable deformation area.The working face cycle pressure step distance was 35~40 m,which plaied an effective role in the control of the roadway surrounding rock.
作者 牛清海 孙少龙 Niu Qinghai;Sun Shaolong(Jizhong Energy Fengfeng Group Co.,Ltd.,Handan 056011,China;Wutongzhuang Mine,Jizhong Energy Fengfeng Group Co.,Ltd.,Handan 056200,China)
出处 《煤炭与化工》 CAS 2024年第5期27-30,共4页 Coal and Chemical Industry
关键词 大埋深 高水充填 沿空留巷 矿压显现 large buried depth high water filling gob-side entry retaining ground pressure behaniour
  • 相关文献

参考文献10

二级参考文献176

共引文献973

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部