摘要
大淑村矿五采区在建立独立通风系统的过程中,遇到外围系统整修工期长、通风路线长,影响下一步矿井正常生产衔接的问题。针对这一问题,该矿调整相邻四、五采区生产系统,引进新装备,解决四、五采区生产系统相互干扰导致的生产衔接紧张,实现了四、五采区分区通风,缩短了采区衔接准备工期,优化了四采区主运输系统,简化了运输环节,提高四采区运输效率,为矿井生产衔接提供保障。
In the process of establishing an independent ventilation system,the fifth mining area of Dashucun Mine encountered the problems of long renovation period and long ventilation route of the peripheral system,which affected the normal production connection of the mine in the next step.In view of this problem,the mine adjusted the production system of the adjacent fourth and fifth mining areas,introduced new equipment,solved the tight production connection caused by the mutual interference of the production systems of the fourth and fifth mining areas,realized the partition ventilation of the fourth and fifth mining areas,shortened the preparation period of the mining area connection,optimized the main transportation system of the fourth mining area,simplified the transportation link,improved the transportation efficiency of the fourth mining area,and provided guarantee for the mine production connection.
作者
于斯洋
Yu Siyang(Hebei Jizhong Hanfeng Mining Co.,Ltd.,Handan 056306,China)
出处
《煤炭与化工》
CAS
2024年第5期109-111,125,共4页
Coal and Chemical Industry
关键词
采区协同
通风路线
系统优化
mining area coordination
ventilation route
system optimization