摘要
结合某区域大型天然气分布式能源中心的调试验收案例,总结调试验收的准备工作和主要步骤,同时根据后期运行发现的相关问题浅谈在设计、建设过程中的注意事项并提出优化措施,旨在为后期同类型能源中心的设计、建设以及调试验收部分过程提供实用性参考。
Combined with the commissioning and acceptance case of a regional large-scale natural gas distributed energy center.It summarizes the preparatory work and main steps of cases of commissioning and acceptance,and at the same time,according to the later operation of the relevant problems found in the process of design,construction and optimization measures.The aim is to provide a practical reference for the design,construction,and partial process commissioning and acceptance of similar energy centers.
作者
袁华磊
YUAN Hualei(Suzhou Wuzhong Suzhou Bay Energy Management Co.,Ltd.)
出处
《上海节能》
2024年第6期979-983,共5页
Shanghai Energy Saving
关键词
天然气分布式
调试验收
三级泵
蓄能罐
Distributed Natural Gas
Commissioning and Acceptance
Three-Stage Pump
Energy Storage Tank