期刊文献+

解决现有夹片更换效率低的新型提升千斤顶设计

New lifting jack design to solve the low efficiency of the existing clip replacement
下载PDF
导出
摘要 文章对现有千斤顶夹片更换效率低下的问题进行研究。通过优化顶松夹紧部件设计并创新性引入顶压回程套、双向联动油缸组件及可拆卸连接设计,实现更高效地提升夹片更换,以及加快施工进度和增强施工安全性。该设计具有良好的行业应用前景,在推广潜力及经济效益等方面都有很好的表现。对促进工程建设效率的提高具有重要的实际意义,目前已在工程中推广和应用。 This paper investigates the low efficiency of the existing jack clip replacement.By optimizing the design of the top release clamping parts and introducing innovative top pressure return sleeves and two-way linkage cylinder assemblies,as well as detachable connection designs,more efficient clamping changes,improved construction schedules and enhanced construction safety are achieved.The design has a good prospect in industry application,and has a good performance in promotion potential and economic benefits.Therefore,the design has important practical significance to promote the improvement of engineering construction efficiency.At present,this design has been popularized and applied in the project.
作者 梁涛 郭世滔 谢诗 严李荣 LIANG Tao;GUO Shitao;XIE Shi;YAN Lirong(Liuzhou Overwem Machinery Co.,Ltd.,Liuzhou 545000,China)
出处 《中国高新科技》 2024年第9期17-19,共3页
关键词 提升千斤顶 夹片更换 顶压回程套 双向联动油缸组件 可拆卸连接设计 lifting jack clip replacement top pressure return sleeve two-way linkage cylinder assembly detachable connection design
  • 相关文献

参考文献3

二级参考文献8

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部