研究建筑施工成本控制和工程造价动态管理措施,确保建筑施工成本控制和工程造价处于预算范围内。通过赢得值BCWP、计划预算值ACWP以及实际支出值BCWS之间的关系进行建筑施工进度和成本的偏差分析。基于建筑工程成本差异CV、项目进度差异SV、时间差异、建筑施工成本绩效指数CPI以及建筑施工进度绩效指数SPI五个指标实现建筑施工进度与成本的动态评估。根据建筑施工已经投入的费用对建筑施工工程造价进行预测,最后采取措施实现建筑施工工程造价动态管理。
Study the dynamic management measures of construction cost control and project cost to ensure that the construction cost control and project cost are within the budget.The deviation analysis of building construction schedule and cost is carried out through the relationship between the earned value BCWP,the planned budget value ACWP,and the actual expenditure value BCWS.The dynamic evaluation of construction progress and cost is realized based on five indicators:construction cost difference CV,project schedule difference SV,time difference,construction cost performance index CPI and construction progress performance index SPI.According to the cost of construction has been invested in the construction of the construction project to predict the cost of the construction project,and finally take measures to achieve the dynamic management of the cost of the construction project.
出处
《江苏建材》
2024年第3期149-152,共4页
Jiangsu Building Materials
关键词
成本控制
工程造价
动态管理
赢得值
计划预算值
cost control
project cost
dynamic management
earned value
planned budget value