文章主要介绍了金川集团镍钻有限公司镍冶炼厂闪速炉电收尘器运行现状及存在的问题,并提出了优化改造方案。本次改造拆除2台60m^(2)的电收尘器,并在原基础上进行新建,通过改造后的运行实践给出了相关建议。
This article mainly introduces the current operation status and existing problems of the flash Smelting furnace electric precipitator in the Jinchuan Group Nickel Cobalt Co.,Ltd.Nickel Smelter,and proposes an optimization and transformation plan.In this renovation,two 6Om’electric precipitators were dismantled and new ones were built on the original foundation.Relevant suggestions were provided through the operation practice after the renovation.
作者
李雪娥
杨贵严
蔡伟
任越中
胡艺荣
Li Xue-e;Yang Gui-yan;Cai Wei;Ren Yue-zhong;Hu Yi-rong
出处
《金川科技》
2024年第2期51-54,58,共5页
Jinchuan Science and Technology
关键词
镍闪速炉
电收尘器
技术改造
运行实践
nickel flash smelting furnace
electric precipitator
technical transformation
operational practice