期刊文献+

高新区靖城园区排洪渠改造工程中边坡防护和技术改造方案分析

Analysis of Slope Protection and Technical Renovation Plan in the Flood Discharge Canal Renovation Project of Jingcheng Park in High-tech Zone
下载PDF
导出
摘要 漳州高新区靖城园区田沧高排渠等三条水渠建设任务是完善九龙江防洪措施的重点工程之一,依照防洪排涝标准解决靖城园区的排洪排涝问题,同时为城区建设创造有利条件,为漳州高新区经济和社会发展提供保障。在田沧高排渠和古湖高排渠工程建设中,结合城市规划要求和发展需要,分析生态护坡不同方案的利弊,提出实施方案,可为同类型的工程实施提供借鉴。 The construction task of the Tiancang High Drainage Canal and other three water channels in Jingcheng Park of Zhangzhou High-tech Zone is one of the key projects to improve the flood control measures of the Jiulong River.According to the flood control and drainage standards,the problem of flood discharge and drainage in Jingcheng Park was solved,while creating favorable conditions for urban construction and providing guarantees for the economic and social development of Zhangzhou High-tech Zone.In the construction of Tiancang High Drainage Canal and Guhu High Drainage Canal,combined with urban planning requirements and development needs,the advantages and disadvantages of different ecological slope protection schemes were analyzed,and implementation plans were proposed,which can provide reference for the implementation of similar projects.
作者 阮丁丁 RUAN Ding-ding
出处 《山西水利科技》 2024年第2期27-30,33,共5页 Shanxi Hydrotechnics
关键词 高新区 排洪改造 边坡防护 技术改造 High-tech zone flood discharge renovation slope protection technical transformation
  • 相关文献

参考文献9

二级参考文献17

共引文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部