基于船架分离设备测量系统在沉管先铺法碎石基础中的应用

Application of Measuring System based on Ship Frame Separation Equipment in Gravel Foundation of Immersed Tunnel by Pre-laying Method
原文传递
导出
摘要 为满足跨石整平作业面大、作业水深大、作业精度要求高以及工效要求高等需求,通过多方比选,选用水下步履式整平设备进行深中通道S08合同段的碎石整平作业,并以“口”字型带月池的船为工作母船。采用沉管隧道基础整平监测系统对已整平碎石垫层的质量进行即时检测,各项数据存储在计算机内,操作人员可通过显示屏及时掌握整平精度的情况,实现了工作母船与整平架分离状态下测量系统高精度指导。 In order to meet the requirements of large surface,deep water depth,high precision and high efficiency,the underwater walking leveling equipment is selected to carry out the leveling operation of the S08Contract Section of the Shenzhen-Zhongshan Link Project through multi-comparison and selection,and the rectangular shaped ship with the moon pool is used as the working mother ship.The monitoring system of immersed tunnel foundation levelling is used to detect the quality of the levelled gravel cushion in real time.The data are stored in the computer,and the operator can grasp the levelling accuracy in time through the display screen,which realizes the high-precision guidance of the measuring system when the working mother ship is separated from the levelling frame.
作者 钟汉滨 李汪讳 唐善军 马家杰 ZHONG Han-bin;LI Wang-hui;TANG Shan-jun;MA Jia-jie(Guangzhou Salvage Bureau,Guangzhou 510220,China;Guangdong Engineering Technology Research Center of Ocean Engineering and Water Emergency Rescue,Guangzhou 510220,China)
出处 《公路》 北大核心 2024年第5期37-41,共5页 Highway
基金 国家重点研发计划(面向海洋重大工程的精密定位关键技术及应用示范),项目编号2023YFB3907200。
关键词 深中通道 沉管隧道 工作母船 船架分离测量系统 整平架 Shenzhen-Zhongshan Link Project immersed tunnel working mother ship ship frame separation measurement system leveling frame