摘要
以黄河中上游地区铁路建设项目水土保持监理工作为背景,总结了该类工程的水土保持工程措施及监理工作开展的思路。介绍了案例工程情况,阐述了水土保持施工的准备工作、防治措施等内容。在监理工作方面,从监理项目部建设、管理制度建设、过程控制和资料管理等方面提出了完善思路。
This article takes the soil and water conservation supervision work of railway construction projects in the middle and upper reaches of the Yellow River as the background,summarizes the soil and water conservation project measures and thinking on the supervision work for such projects.The article introduces the case engineering situation,and then elaborates the preparation work for soil and water conservation construction,specific prevention and control measures,and other contents.In terms of supervision work,the article proposes improvement ideas from the construction of the supervision project department,management system construction,process control,and data management.
作者
程鹏
王青
CHENG Peng;WANG Qing(Yellow River Upper and Middle Reaches Management Bureau of the Yellow River Water Resources Commission of the Ministry of Water Resources,Xi'an 710021,China)
出处
《水科学与工程技术》
2024年第3期30-33,共4页
Water Sciences and Engineering Technology
关键词
黄河中上游
铁路建设
水土保持
监理
middle and upper reaches of the Yellow River
railway construction
soil and water conservation
supervision