摘要 针对分布式电源(DG)不确定性的有源配电网重构问题,提出两阶段动态鲁棒重构优化方法。在第一阶段进行辐射状配电网络开关重构优化,在第二阶段在考虑DG出力和负荷需求的不确定预算集下,进行含电池储能的有源配电网最优潮流优化。由于第二阶段优化问题含电池储能的充放电状态,采用嵌套列与约束生成算法将两阶段动态鲁棒重构模型转化为双层迭代求解。在4个不同规模的配电系统算例结果表明该文所提基于嵌套列与约束生成算法(CCG)的配电网动态鲁棒重构方法具有良好收敛性。 Aiming at the problem of active distribution network reconfiguration under DG uncertainty,a two-stage dynamic robust reconfiguration optimization method is proposed.In the first stage,the switch reconfiguration optimization of radial distribution network is carried out.In the second stage,the optimal power flow optimization of active distribution network with battery energy storage is carried out considering the uncertain budget set of DG output and load demand.Because the second stage optimization problem includes the charging and discharging state of battery energy storage,the nested column and constraint generation algorithm is used to transform the two-stage dynamic robust reconfiguration model into a bilevel iterative solution.The results of four distribution systems with different scales show that the proposed dynamic robust reconfiguration method of distribution network based on nested CCG has good convergence.
作者 靳攀润 宋汶秦 刘永成 Jin Panrun;Song Wenqin;Liu Yongcheng(Development Business Department of State Grid Gansu Electric Power Company,Lanzhou 730050,China)
出处 《太阳能学报》 EI CAS CSCD 北大核心 2024年第6期208-216,共9页 Acta Energiae Solaris Sinica
关键词 有源电网 不确定性分析 分布式电源 配电网重构 两阶段鲁棒优化 active electric networks uncertainty analysis distributed power generation distribution network reconfiguration two stage robust optimization
  • 相关文献

参考文献23

二级参考文献307

共引文献614

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部