期刊文献+

从枢纽站升级到站城一体更新——深圳黄木岗项目的站城一体核心思路

Staged Redevelopment from a Hub Station to an Integrated Station-town:Core Concept of Shenzhen HuangMuGang Project
下载PDF
导出
摘要 本文介绍了日建设计在日本与中国参与的站城一体化城市开发案例,探讨了未来轨道建设和城市更新相结合的发展方向。在深圳黄木岗枢纽项目中,借鉴了日本东京涩谷站城市更新的开发经验,实现了以轨道车站等市政设施重建为引擎的城市更新机制,主动引导周边街区的改造,通过多方合作推动整个城市更新。其中,回顾其融合日本城市开发经验与中国城市建设的实际情况,分析了因地制宜的规划调整,对该项目的未来发展进行了展望。 This thesis introduces Nikken Sekkei’s engagement in typical Transit Oriented Development(TOD)initiatives in Japan and China,and discusses the significance of integrating railway station redevelopment and urban renewal.In the Huangmugang Hub project(Shenzhen),experiences from the Shibuya Station redevelopment project are applied to establish a mechanism for urban renewal driven by the reconstruction of municipal facilities,which subsequently leads to the transformation of surrounding neighborhoods through collaborative efforts.Additionally,the thesis analyzes adaptive planning adjustments,and provides a prospective outlook on the project’s future development.
作者 横尾茂 长谷川隆 刘超 杨珅 李任官 黄琼仪 李昌文 Shigeru Yokoo;Takashi Hasegawa;Chao Liu;Shen Yang;Renguan Li;Qiongyi Huang;Changwen Li(Nikken Sekkei Ltd;Shenzhen Metro Company Co.,Ltd)
出处 《城市设计》 2024年第1期72-81,共10页 Urban Design
关键词 站城一体 城市更新 多方合作 市政设施重建 Transit Oriented Development Urban renewal Collaborative efforts Reconstruction of municipal facilities

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部