摘要 尾矿库在矿山开采中发挥着重要作用,同时又存在一定的安全隐患,需要加强工程监测,及时预测风险,采取相应的治理措施,降低事故发生概率。论文研究了尾矿库中期稳定性分析及应对措施,在掌握工程基本情况的条件下,从浸润线分析、渗透稳定性分析、抗滑稳定性分析、稳定性综合评价、具体应对措施等方面着手,分析了工程案例的中期稳定性,并采取了有效的保护措施,维护工程项目安全、平稳运行。 Tailings ponds play an important role in mining,but there are certain safety risks,it is necessary to strengthen engineering monitoring,timely forecast risks,take corresponding measures to reduce the probability of accidents.This paper studies the medium-term stability analysis and countermeasures of tailings pond.Under the condition of mastering the basic situation of the project,it analyzes the medium-term stability of the project case from the aspects of infiltration line analysis,permeability stability analysis,anti-slip stability analysis,comprehensive stability evaluation and specific countermeasures,and takes effective protection measures to maintain the safe and smooth operation of the project.
作者 张剑 ZHANG Jian(Hydrogeological Brigade of Jiangxi Provincial Geological Bureau,Nanchang 330095,China)
出处 《工程建设与设计》 2024年第12期25-27,共3页 Construction & Design for Engineering
关键词 尾矿库 稳定性分析 应对措施 工程治理 tailings pond stability analysis response measures engineering governance
  • 相关文献

参考文献2

二级参考文献20

共引文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部