下沉广场基坑施工邻近地铁车站结构安全评估与监测实例分析

Case Analysis of Safety Evaluation and Monitoring of Sunken Square Foundation Pit Construction Adjacent to Subway Station
下载PDF
导出
摘要 以南宁市某下沉广场基坑工程邻近5号线地铁车站结构施工为例,研究了专项监测方案,重点分析了基坑开挖施工影响既有地铁车站结构安全评估预测与实测的监测变形。研究表明,实测的监测变形与安全评估预测的变形相吻合,通过评估预测加强施工措施可以有效控制变形。 The paper takes the construction of a sinking square foundation pit project near the subway station on Line 5 in Nanning City as an example,and studies a special monitoring plan.The focus is on analyzing the impact of excavation construction on the safety assessment prediction and actual monitoring deformation of the existing subway station structure.The research shows that the actual monitoring deformation is consistent with the deformation predicted by the safety assessment.Strengthening construction measures through evaluation prediction can effectively control deformation.
作者 陶盾 石江宇 李景翔 黄湛智 TAO Dun;SHI Jiang-yu;LI Jing-xiang;HUANG Zhan-zhi(Beijing Urban Construction Exploration&Surveying Design Research Institute Co.Ltd.,Beijing 100101,China;Beijing Key Laboratory of Deep Foundation Pit Engineering for Urban Rail Transit,Beijing 100101,China)
出处 《工程建设与设计》 2024年第12期28-30,共3页 Construction & Design for Engineering
关键词 下沉广场 基坑施工 地铁车站 安全评估 监测 sunken square foundation pit construction subway stations security assessment monitor
  • 相关文献

二级参考文献24

共引文献39

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部